THE APPLICATION OF MULTIFACTOR MODEL LITCAC IN THE ORGANIZATION OF ASSEMBLY WORK OF FLEXIBLE CORRUGATED STEEL STRUCTURES
针对波纹钢板结构装配,基于劳动消耗估算建立LITCAC模型,结合TOPSIS方法优化装配组织,预测现场进度与成本。
Structural corrugated steel plate structures (SCSPS) are the subject of this paper. Some aspects of assembly of these structures are discussed, indicating factors of organization. The considerations are based on the estimation of labour consumption. On the grounds of regression and correlation one can create a new model of labour consumption and total costs of assembly work. This model is called LITCAC and constitutes “an open” type model. It is for estimating labour consumption, time and cost of assembly of CSPS in four modules. A combination of the new proposed model with the method of multi‐criteria optimization (in this case TOPSIS method) enables to improve the organization of predicting the job site progress as well as the cost related to site activities.