单机延迟范围界限的改进

Improved Bounds for the Range of Lateness on a Single Machine

Journal of the Operational Research Society · 1988
被引 12
ABS 3

中文导读

本文针对单机调度中最小化延迟范围的问题,基于Townsend的分支定界方法,提出了一个关于成本函数正则组合的简单通用结果,改进了Gupta和Sen的算法。

Abstract

In a recent article, Gupta and Sen have developed an algorithm to minimize the range of lateness on a single machine. The algorithm is based on the branch-and-bound approach suggested by Townsend for single-machine problems with quadratic penalty functions of completion times. In this paper, a simple general result for regular composition of cost functions is presented, application of which improves the Gupta and Sen procedure.

单机调度分支定界生产调度数学优化