Integration Between Business Planning and Information Systems Planning: Validating a Stage Hypothesis
提出并实证验证了一个信息系统规划演进的阶段模型,通过调查高级信息系统主管,验证了业务规划与信息系统规划整合的各个阶段及其基准变量。
ABSTRACT This paper proposes and empirically validates a stages of growth model for the evolution of Information Systems Planning (ISP). A questionnaire survey of senior IS executives is used to gather information pertaining to the stages of growth model, which includes measurement of the nature and level of integration between business planning (BP) and ISP. The del test is used to validate empirically benchmark variables for each stage of BP‐ISP integration. The results support the stages of growth model of BP‐ISP integration and the benchmark variables are generally found to be successful in predicting the stage of integration.