The Analysis of Activity Networks Under Generalized Precedence Relations (GPRs)
提出广义优先关系下的活动网络模型,分析时间一致性、活动关键性和灵活性,并探讨在分段线性时间-成本函数下优化活动工期和构建工期-成本函数的问题。
We present a model for activity networks under generalized precedence relations (GPRs), discuss its temporal analysis and the issues that may arise relative to inconsistency among the specified relations and the activity durations. We also give more precise definition to the concept of criticality of an activity, and introduce the new concept of flexibility of an activity which is akin to the traditional concept of activity floats in regular CPM, with the latter taking on different meaning from its common interpretation in standard CPM. Issues of optimization are raised when one assumes, for each activity, a piecewise-linear time-cost function that permits positive and negative deviations from its least-cost duration between specified lower and upper bounds on that duration. We seek the optimal activity durations subject to the specified GPRs and a given due date λ. We also seek the construction of the complete project duration-cost function between the project minimum duration and its least-cost duration when the due date λ is interpreted, first, as a “deadline” and, second, as a “target date” with rewards for early, and penalties for late completion. The relations between the problems posed and the uncapacitated minimum cost flow problems are revealed and are utilized in the algorithmic solution of the problems.