加权延迟成本作业车间的优先级规则

Priority Rules for Job Shops with Weighted Tardiness Costs

Management Science · 1987
被引 568 · 同刊同年前 5%
人大 A+FT50UTD24ABS 4*

中文导读

针对作业车间调度中加权延迟问题,开发并测试了高效的分派规则,考虑了不同客户订单的差异化延迟惩罚,实验表明新规则在最小化加权延迟惩罚方面优于现有规则,且对延迟工件数、在制品库存成本等指标也表现稳健。

Abstract

Mainstream research in priority dispatching has considered jobs with equal delay penalties, thereby ruling out strategic differentiation of customer orders. We develop and test efficient dispatching rules for the weighted tardiness problem with job-specific due dates and delay penalties. Our approach builds on previous greedy heuristics which assign the priority on the basis of the expected tardiness cost per immediate processing requirements. In multi-machine applications, estimates of the remaining leadtime are needed to determine local operation due dates and to evaluate the adequacy of the job's slack. Two slightly different “look-ahead” features are identified, and the corresponding priority rules are tested in job shop experiments with a variety of load conditions. The results indicate that the new rules are not only superior to competing rules for minimizing weighted tardiness penalties but are also robust for several other criteria, such as the number of tardy jobs and the costs of in-process inventories.

加权延迟成本作业车间优先调度规则交货期