关于“随机无节奏生产线设计:回顾与进一步实验结果”的评注

A note on “Stochastic unpaced line design: Review and further experimental results”

JOURNAL OF OPERATIONS MANAGEMENT · 1989
被引 13
人大 AFT50UTD24ABS 4*

中文导读

指出1985年一项关于“碗形现象”的研究存在实验缺陷,无法验证装配线工作站平均任务时间是否应呈碗形分布,并通过模拟实验和近期研究为Hillier和Boling的原始结果提供进一步澄清。

Abstract

Executive Summary A 1985 study in this journal examined the “bowl phenomenon” and claimed to demonstrate that Hillier and Boling's original results 1967 were due to an assumption of unrealistically large variations in processing times. A closer look at these findings reveals that they are derived from a flawed experiment that cannot possibly serve to verify whether or not average task times at work stations on an assembly line should be selected in a bowl distribution. We offer further arguments in clarification of Hillier and Boling's original work based both on our own simulation experiments as well as recent studies by other authors. We also comment on the need to orient future efforts toward practical integration of the bowl phenomenon result with other findings that relate to improving the throughput of unpaced assembly lines.

生产管理运筹学工业工程装配线设计