具有延迟消耗松弛的多阶段资本预算

Multistage Capital Budgeting with Delayed Consumption of Slack

Management Science · 2012
被引 15
人大 A+FT50UTD24ABS 4*

中文导读

研究两阶段投资项目,企业可通过提前终止限制经理信息租金,发现最优资本分配方案会在第一阶段放弃正净现值项目,第二阶段根据经理报告有时实施负净现值项目或放弃正净现值项目。

Abstract

Capital budgeting frequently involves multiple stages at which firms can continue or abandon ongoing projects. In this paper, we study a project requiring two stages of investment. Failure to fund Stage 1 of the investment precludes investment in Stage 2, whereas failure to fund Stage 2 results in early termination. In contrast to the existing literature, we assume that the firm can limit the manager's informational rents with the early termination of the project. In this setting, we find that the firm optimally commits to a capital allocation scheme whereby it forgoes positive net present value (NPV) projects at Stage 1 (capital rationing), whereas at Stage 2, depending on the manager's previous report, it sometimes implements projects with a negative continuation NPV but in other situations forgoes implementing projects with positive continuation NPVs. This paper was accepted by Mary Barth, accounting.

多阶段资本预算资本配给信息租金项目终止