双资源约束系统中作业车间与混合流水车间路径的对比研究

JOB‐SHOP VS. HYBRID FLOW‐SHOP ROUTING IN A DUAL RESOURCE CONSTRAINED SYSTEM

DECISION SCIENCES · 1985
被引 35
人大 AABS 3

中文导读

研究了作业路径模式对双资源约束系统性能的影响,通过模拟三种不同路径模式并分析调度规则的表现,发现路径模式对调度规则的相对有效性无显著影响。

Abstract

ABSTRACT This paper studies the impact of job routing pattern on the performance of dual resource constrained (DRC) systems. Three markedly different job routing patterns are simulated using a DRC system model that incorporates labor transfer times. The problem is viewed from two perspectives: one portion of the analysis focuses on the relative performances of five different dispatching rules as the routing pattern varies; the other examines the effect of the routing pattern on each rule's individual performance. One generalized conclusion of this study is that routing pattern has no significant impact on the relative effectiveness of various dispatching rules. Consequently, findings from pure job‐shop research studies may be applied to situations where a mixture of job‐shop and flow‐shop routings is present.

生产调度作业车间调度双资源约束系统路径模式