存在随机返工的瓶颈设施的最优运行策略

Optimal Operating Policy for a Bottleneck with Random Rework

Management Science · 1995
被引 26
人大 A+FT50UTD24ABS 4*

中文导读

研究一个同时处理常规作业和返工作业的瓶颈设施,通过半马尔可夫决策过程证明存在最优阈值策略,并给出计算临界值的方法,帮助管理者在返工数量超过阈值时切换作业类型以最小化平均运营成本。

Abstract

This paper presents a model of a bottleneck facility that performs two distinct types of operations: “regular” and “rework.” Each job is subjected to a test after completing the regular operation at the bottleneck. If the job passes the test, then it continues its process downstream. Otherwise, the job will cycle back to the bottleneck stage for rework operation. Upon the completion of a batch of regular jobs, the decision maker observes the amount of rework and decides on whether to switch over to process the reworks or continue to process another batch of regular jobs. It is assumed that both switch-over time and cost are incurred when the facility switches from performing one type of operation to a different type. The goal of the analysis is to characterize the optimal operating policy for the bottleneck so that the average operating cost is minimized. In order to characterize the optimal operating policy, we first formulate the problem as a semi-Markov decision process. Then we show that there exists an optimal “threshold” operating policy that can be described as follows: upon completion of a batch of regular jobs, switch over to process the reworks only if the number of reworks exceeds a critical value. In addition, we develop a simple procedure to compute the critical value that specifies the optimal threshold policy. Moreover, we evaluate the impact of batch sizes, yield, and switch-over time on the optimal threshold policy.

瓶颈设施返工最优运行策略阈值策略