多阶段多产品能力受限系统中的生产调度网络规划模型

Network Programming Models for Production Scheduling in Multi-Stage, Multi-Item Capacitated Systems

Management Science · 1984
被引 69
人大 A+FT50UTD24ABS 4*

中文导读

研究多产品多阶段生产调度问题,将三周期问题转化为网络模型,并基于此提出滚动启发式算法,与标准线性规划进行对比,讨论算法失效条件及扩展方法。

Abstract

This paper investigates a multi-item, multi-level production scheduling problem with linear costs and production and inventory constraints at one key facility. Two multi-item problems—one in which the constraint was on shipping capability and one in which there was a final stage bottleneck machine—motivated the paper. A multi-item facilities-in-series problem is formulated, in standard fashion, as a linear program. Then we show that in certain important cases the 3-period problem is a network problem. This 3-period result is used as the basis for a rolling heuristic for T-period problems. The conditions under which this heuristic fails to find optimal solutions are discussed and computational comparisons to standard linear programming are given. Finally, we discuss ways of dealing with two constrained facilities and with setup costs.

多阶段生产调度多产品系统网络规划模型滚动式启发算法