在按库存生产系统中增加一个按订单生产项目的影响

The Impact of Adding a Make-to-Order Item to a Make-to-Stock Production System

Management Science · 1999
被引 94
人大 A+FT50UTD24ABS 4*

中文导读

研究在按库存生产系统中增加按订单生产产品线的影响,提出可分析优化成本与绩效的策略,帮助管理者评估产品线多样化或标准化的物流后果。

Abstract

Stochastic Economic Lot Scheduling Problems (ELSPs) involve settings where several items need to be produced in a common facility with limited capacity, under significant uncertainty regarding demands, unit production times, setup times, or combinations thereof. We consider systems where some products are made-to-stock while another product line is made-to-order. We present a rich and effective class of strategies for which a variety of cost and performance measures can be evaluated and optimized efficiently by analytical methods. These include inventory level and waiting-time distributions, as well as average setup, holding, and backlogging costs. We also characterize how strategy choices are affected by the system parameters. The availability of efficient analytical evaluation and optimization methods permits us to address the impact of product line diversification or standardization on the performance of the manufacturing system, in particular the logistical implications of adding low-volume specialized models to a given make-to-stock product line.

经济批量调度问题按单生产按库存生产库存与等待时间分布