确定性看板系统的数学规划方法

A Mathematical Programming Approach to a Deterministic Kanban System

Management Science · 1987
被引 180
人大 A+FT50UTD24ABS 4*

中文导读

针对确定性多阶段、有产能约束的装配树结构生产环境,建立了看板系统的数学规划模型,并讨论了求解方法及三个有实际意义的特例。

Abstract

In this paper we present a mathematical programming model for the Kanban system in a deterministic multi-stage capacitated assembly-tree-structure production setting. We discuss solution procedures to the problem and address three special cases of practical interest.

看板系统数学规划确定性生产系统多阶段装配