斯坎伦计划十年经验:一个案例研究

A decade's experience with the Scanlon Plan: A case study

JOURNAL OF ORGANIZATIONAL BEHAVIOR · 1987
被引 7
人大 AABS 4

中文导读

通过九年的实地数据,研究了斯坎伦计划在大型制造工厂的实施效果,发现该计划适度提高了生产力、稳定了就业并改善了劳资关系。

Abstract

Abstract This field study examined the operation and impact of the Scanlon Plan at a large manufacturing facility. An interrupted time‐series research design, augmented by extensive qualitative data analysis was used to analyse the productivity and employment experience over a nine‐year period. The plan resulted in modest increases in productivity and stable employment, while improving the overall union‐management relationship. Through the Scanlon structure for employee involvement, over 5000 suggestions have been made. Moderate and consistent productivity sharing bonuses were paid.

运营管理人力资源管理劳资关系生产力研究