混合静态与动态流程时间估计以确定交货期

Mixing static and dynamic flowtime estimates for due‐date assignment

JOURNAL OF OPERATIONS MANAGEMENT · 1993
被引 57
人大 AFT50UTD24ABS 4*

中文导读

提出一种混合流程时间估计方法,结合静态与动态估计,通过仿真实验证明该方法在平衡和瓶颈车间中分别将平均延迟降低25%和40%,显著提升交货期准确性。

Abstract

Abstract Prediction of job flowtimes is important from the perspectives of both providing internal control and customer satisfaction. More specifically, accurate and precise flowtime prediction can facilitate proper timing for the release of materials and resources, improved accuracy of delivery dates to customers, and identification of jobs that require expediting. The objective of this paper is to introduce a new approach to flowtime prediction which improves performance quality over that found in existing dynamic flowtime estimation models. This new approach, mixed flowtime estimation, incorporates both static and dynamic flowtime estimates into a single, flowtime prediction model. In this investigation, mixed and dynamic models are compared experimentally using computer simulation of a job shop under various congestion conditions and dispatching heuristics. The results of this investigation reveal that the mixed flowtime prediction models provide significant improvements in job shop due‐date estimation performance. Statistically significant performance improvements are obtained in both the average lateness and fraction tardy jobs for mixed estimates. Specifically, average lateness is reduced by 25% in the balanced shop and 40% in the bottleneck shop. This improvement enables a corresponding increase in the accuracy of job flowtime estimates, and, hence, due‐date assignment accuracy. Due‐date performance improvements are observed for each scheduling heuristic investigated.

作业车间调度交货期设定流程时间预测生产调度