生产系统中生产周期与检验计划的联合确定

Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System

Management Science · 1987
被引 415 · 同刊同年前 8%
人大 A+FT50UTD24ABS 4*

中文导读

研究生产周期(或生产批量)与维护检验的联合控制问题,给出了检验有效性的判定关系,并求解了最优等间隔检验计划及调整后的经济生产批量,适用于生产与维护决策者。

Abstract

Classical Economic Manufacturing Quantity (EMQ) models have usually ignored the possibility of process deterioration and the existence of defective items in the production lot. Moreover, the use of machine inspection for maintenance and restoration purposes has not been considered. On the other hand, past studies on maintenance models do not consider the length of a production run to be a decision variable. This paper addresses the problem of joint control of production cycles or manufacturing quantities and maintenance by inspection. A simple relationship has been developed to determine the effectiveness of maintenance by inspection. Furthermore, when maintenance by inspection is adopted, it is shown that the optimal inspection intervals are equally-spaced. The problem of simultaneous determination of EMQ and the inspection schedules is solved by using an approximation to the cost function. The resulting EMQ is found to be an adjustment to the classical EMQ. Finally, the relationships between different parameter values and the magnitudes of the cost penalty for using the classical EMQ are examined.

经济制造批量检验计划过程退化联合优化