在含产品选项的装配线上最小化工作超载的排序问题

Sequencing to Minimize Work Overload in Assembly Lines with Product Options

Management Science · 1991
被引 221
人大 A+FT50UTD24ABS 4*

中文导读

研究在定速装配线上对具有大量客户指定选项组合的作业进行排序,以最大化完成工作量或最小化未完成工作量,提出针对单站最优解及多站启发式算法,并用汽车公司数据验证。

Abstract

We address the problem of sequencing jobs, each of which is characterized by one of a large number of possible combinations of customer-specified options, on a paced assembly line. These problems arise frequently in the automotive industry. One job must be launched into the system at equal time intervals, where the time interval (or cycle time) is prespecified. The problem is to sequence the jobs to maximize the total amount of work completed, or equivalently, to minimize the total amount of incomplete work (or work overload). Since there is a large number of option combinations, each job is almost unique. This fact precludes the use of existing mixed model assembly line sequencing techniques. We first consider the sequencing problem for a single station which can perform two different sets of operations. We characterize the optimal solution for this problem and use the results as the basis for a heuristic procedure for multiple stations. Computational results with data from a major automobile company are reported.

装配线排序工作超载产品选项启发式算法