Note—The Impact of Inspection Delay on Process and Inspection Lot Sizing

Management Science · 1990
被引 73
人大 A+FT50UTD24ABS 4*

中文导读

研究检验延迟时间(从检验到获知结果期间的生产量)如何影响最优生产批量和检验批量,发现延迟很小时问题可分解为两个独立问题,延迟很大时则只需一次检验。

Abstract

Models in which process quality and lot sizing interact have recently been developed. Lot sizes should be reduced to compensate for poor quality if no effective inspection is possible. This note introduces an inspection delay time, measured in units produced after an inspection is made until results are known. If the inspection delay is negligible, then the problem reduces essentially to two separate lot sizing problems: the classical EOQ lot sizing problem and an inspection lot sizing problem. If the delay is great, then only one inspection should be made and the lot size is as given by Porteus, and Rosenblatt and Lee. This note seeks the optimal production and inspection lot sizes for the full spectrum of inspection delays. The impact of the results is illustrated numerically. The value of automated defect control (with 100% inspection and immediate production stoppage upon detection of a defect) is discussed.

生产批量检验批量检验延迟缺陷控制