MRP系统中开放订单交期维护问题研究

Open Order Due Date Maintenance in MRP Systems

Management Science · 1989
被引 38
人大 A+FT50UTD24ABS 4*

中文导读

研究在采用物料需求计划的作业车间中,如何维护开放订单的交期。比较了固定交期和动态交期两种方法,发现动态方法在多种环境下表现更优,且运营条件影响两者的绩效差异。

Abstract

This paper is concerned with the problem of maintaining open order due dates in job shops that plan and schedule their operations using Material Requirements Planning (MRP) methodology. Two different techniques for dealing with open order due date changes are analyzed using customer service level and total inventory level performance measures. With the first technique, called the fixed due date approach, due dates are never changed from those originally assigned to orders when released to the shop. With the second technique, called the dynamic due date approach, all due dates are updated to reflect actual need dates. Beyond evaluating them in an MRP context, this study extends current understanding of these two techniques by observing them in a variety of different operating environments. The results of the study indicate that: (1) the dynamic due date approach performs as good as, or better than, the fixed due date approach across a wide range of operating conditions; and (2) operating conditions have an important effect on the magnitude of the performance differential between the two approaches.

MRP系统开放订单到期日维护作业车间