流水车间最小化延迟调度:替代求解方法的构建与评估

Minimum tardiness scheduling in flow shops: Construction and evaluation of alternative solution approaches

JOURNAL OF OPERATIONS MANAGEMENT · 1995
被引 27
人大 AFT50UTD24ABS 4*

中文导读

研究了流水车间中最小化总延迟的调度问题,利用流水车间结构构建了局部最优条件和改进启发式方法,并验证了其优于传统瓶颈调度方法。

Abstract

Abstract Surveys of industrial scheduling practice show that meeting customer due dates is a critical concern for many manufacturing systems. While there is considerable research on the effectiveness of scheduling rules in job shops, very little work is reported on flow shops. Although scheduling rules developed for job shops can be applied in other systems as well, we show that the inherent structure of a flow shop can be utilized to construct effective solution procedures. In particular, for the total tardiness problem, we develop conditions for local optimality in a 2‐machine flow shop, and use these results to generate an efficient improvement heuristic procedure. We also construct solution methods that utilize the notion of shifting bottlenecks. Our computational experience reveals the superiority and robustness of the proposed approaches under a variety of problem scenarios. The results of this study also indicate the need to look beyond permutation schedules for solving the flow shop tardiness problem. Furthermore, they suggest that the criterion for determining machine criticality needs to take the scheduling objective into consideration. While it appears intuitive to impute criticality on the basis of machine workloads and, therefore, emphasize the bottleneck machine for generating the shop schedule, this approach may frequently result in inferior system performance.

流水车间调度延迟问题生产调度运筹学