滚动计划期下冻结主生产计划

Freezing the Master Production Schedule Under Rolling Planning Horizons

Management Science · 1987
被引 128
人大 A+FT50UTD24ABS 4*

中文导读

研究在滚动计划期下冻结主生产计划的三种决策变量(冻结方法、冻结区间长度、计划期长度),通过仿真实验发现冻结50%以内对成本和库存影响不大,且基于订单的冻结方法优于基于周期的。

Abstract

The stability of the Master Production Schedule (MPS) is a critical issue in managing production operations with a Material Requirements Planning System. One method of achieving stability is to freeze some portion or all of the MPS. While freezing the MPS can limit the number of schedule changes, it can also produce an increase in production and inventory costs. This paper examines three decision variables in freezing the MPS: the freezing method, the freeze interval length, and the planning horizon length. Simulation experiment results are reported which suggest that freezing up to 50% of the planning horizon has a marginal effect on production and inventory cost under a wide range of operating conditions. These results also suggest that an order based freezing method produces superior results in comparison with a period based method.

主生产计划冻结滚动计划期计划冻结方法冻结区间长度