滚动时域环境下单设施多产品问题的动态批量确定

DYNAMIC LOT SIZING FOR A SINGLE‐FACILITY MULTIPRODUCT PROBLEM IN A ROLLING‐HORIZON ENVIRONMENT

DECISION SCIENCES · 1987
被引 3
人大 AABS 3

中文导读

研究了不允许缺货的单设施多产品生产计划模型,推导出规划时域定理,并据此开发了前向算法和滚动时域下首期生产选择程序,仿真实验证明其成本有效性。

Abstract

ABSTRACT This paper considers a production planning model for a single‐facility multiproduct problem where backlogging is not allowed. A planning‐horizon theorem is derived. From that theorem, a forward algorithm for finding an optimal solution over a finite horizon and a procedure for selecting the first‐period production in a rolling‐horizon environment are developed. Computational results from a set of simulation experiments designed to investigate the cost effectiveness of the procedure demonstrate its effectiveness.

生产计划动态批量滚动时域优化算法