轮班构建程序的仿真分析

A Simulation Analysis of Tour-Shift Construction Procedures

Management Science · 1982
被引 63
人大 A+FT50UTD24ABS 4*

中文导读

通过仿真分析六种轮班排班方案对生产率的影响,基于俄亥俄国家银行数据,为服务型企业每周人员配置提供管理启示。

Abstract

Work force scheduling research over the last few years has concentrated on the shift scheduling problem in service oriented firms (telephone operators, postal employees, bank encoders, etc.). In all cases, the authors were primarily interested in the evaluating procedures (optimal and heuristic) to determine the appropriate number of workers to be assigned to the available set of work schedules to meet fluctuating work volumes. However, more attention should be given to how the available shift schedules were defined (start times, durations, etc.) and their impact on maintaining good productivity levels. This paper analyzes the impact of six different approaches in defining the available weekly tour-shift schedules. Tests are conducted to evaluate the performance of the six approaches using operating data from Ohio National Bank for the check proof and encoding activity. The results of this study provide some useful managerial insights into the issues of effectively staffing personnel on a weekly basis. First, restrictive employment policies/customs can substantially increase costs. Second, structured procedures can be used to identify and build good employment schedules for a weekly assignment. And third, the structured procedures presented here provide useful cost and productivity information for evaluating various staffing decisions, and weighing these decisions with other intangible factors such as employee morale and turnover.

劳动力排班班次设计周班次调度银行编码作业