任务小组中的时间节奏:群体发展还是截止日期压力?

Temporal pacing in task forces: Group development or deadline pressure?

JOURNAL OF MANAGEMENT · 1997
被引 59
人大 AFT50ABS 4*

中文导读

研究通过两个实验分离了任务节奏与群体生命周期,发现间断平衡模型中的时间模式反映的是截止日期下的任务节奏,而非群体发展过程。

Abstract

Research on the punctuated equilibrium model of group development confounded group life span with member tusk completion. We report two studies that separate task pacing, from life span development. In one, 50 students simultaneously performed group and individual projects. In the second, student groups worked on two tasks sequentially. Results indicate that the temporal pattern postulated in the punctuated equilibrium model reflects task pacing under u deadline, rather than the process of group development.

群体发展时间节奏任务小组间断平衡模型