制造中的瓶颈资源分配

Bottleneck Resource Allocation in Manufacturing

Management Science · 1996
被引 14
人大 A+FT50UTD24ABS 4*

中文导读

提出一种二分法,用于解决制造和服务中离散、单调的资源分配问题,并推广到含耦合约束的装配释放计划问题,帮助管理者在零件共用环境下实现目标服务水平。

Abstract

Many resource-allocation problems in manufacturing and service operations require selecting integer-valued levels for various activities that consume “nondecreasing amounts” of limited resources. System productivity, to be maximized, is limited by the least productive (bottleneck) activity. We first review a basic bisection method that can solve this discrete, monotonic resource-allocation problem even with a nonlinear objective and constraints. We then generalize the basic algorithm to solve an enhanced version of the problem containing additional coupling constraints on the allocation decisions. This generalization applies to assembly-release planning (ARP) in a multiproduct assemble-to-forecast environment with part commonality. The ARP problem requires deciding the number of kits for each product to release for assembly in every time period, using the available parts, to achieve if possible the target service levels for all products and time periods or minimize the maximum deviation of the actual service levels from the targets. We also consider extensions of the ARP model incorporating precedence constraints and part substitutability, and show how to modify the bisection method to solve these problems.

瓶颈资源分配二分法装配释放规划耦合约束