基于满意准则的项目管理总成本控制

Total Cost Control in Project Management via Satisficing

Management Science · 2013
被引 64
人大 A+FT50UTD24ABS 4*

中文导读

针对活动时间不确定的项目,提出一种基于条件风险价值满意准则的鲁棒优化模型,通过线性或分段线性决策规则控制赶工和总成本,相比传统方法提高了成功率和鲁棒性。

Abstract

We consider projects with uncertain activity times and the possibility of expediting, or crashing, them. Activity times come from a partially specified distribution within a family of distributions. This family is described by one or more of the following details about the uncertainties: support, mean, and covariance. We allow correlation between past and future activity time performance across activities. Our objective considers total completion time penalty plus crashing and overhead costs. We develop a robust optimization model that uses a conditional value-at-risk satisficing measure. We develop linear and piecewise-linear decision rules for activity start time and crashing decisions. These rules are designed to perform robustly against all possible scenarios of activity time uncertainty, when implemented in either static or rolling horizon mode. We compare our procedures against the previously available Program Evaluation and Review Technique and Monte Carlo simulation procedures. Our computational studies show that, relative to previous approaches, our crashing policies provide both a higher level of performance, i.e., higher success rates and lower budget overruns, and substantial robustness to activity time distributions. The relative advantages and information requirements of the static and rolling horizon implementations are discussed. This paper was accepted by Dimitris Bertsimas, optimization.

项目工期应急管理鲁棒优化条件风险价值