构建带有产品回收的闭环供应链应急规划

Building contingency planning for closed‐loop supply chains with product recovery

JOURNAL OF OPERATIONS MANAGEMENT · 2002
被引 428
人大 AFT50UTD24ABS 4*

中文导读

通过三个案例研究,探讨影响闭环供应链中产品回收的生产计划与控制因素,并基于产品-过程矩阵构建了一个应急规划框架,适用于再制造运营的相似性与差异性分析。

Abstract

Abstract Contingency planning is the first stage in developing a formal set of production planning and control activities for the reuse of products obtained via return flows in a closed‐loop supply chain. The paper takes a contingency approach to explore the factors that impact production planning and control for closed‐loop supply chains that incorporate product recovery. A series of three cases are presented, and a framework developed that shows the common activities required for all remanufacturing operations. To build on the similarities and illustrate and integrate the differences in closed‐loop supply chains, Hayes and Wheelwright’s product–process matrix is used as a foundation to examine the three cases representing Remanufacture‐to‐Stock (RMTS), Reassemble‐to‐Order (RATO), and Remanufacture‐to‐Order (RMTO). These three cases offer end‐points and an intermediate point for closed‐loop supply operations. Since they represent different positions on the matrix, characteristics such as returns volume, timing, quality, product complexity, test and evaluation complexity, and remanufacturing complexity are explored. With a contingency theory for closed‐loop supply chains that incorporate product recovery in place, past cases can now be reexamined and the potential for generalizability of the approach to similar types of other problems and applications can be assessed and determined.

闭环供应链产品回收再制造生产计划与控制应急规划