卷材涂装中的集成排序与调度

Integrated Sequencing and Scheduling in Coil Coating

Management Science · 2011
被引 23
人大 A+FT50UTD24ABS 4*

中文导读

研究了钢铁生产中卷材涂装环节的排序与调度问题,提出一种集成优化模型,通过遗传算法和启发式方法将生产周期缩短超过13%,已在德国钢厂实际应用。

Abstract

We consider a complex planning problem in integrated steel production. A sequence of coils of sheet metal needs to be color coated in consecutive stages. Different coil geometries and changes of colors necessitate time-consuming setup work. In most coating stages one can choose between two parallel color tanks. This can either reduce the number of setups needed or enable setups concurrent with production. A production plan comprises the sequencing of coils and the scheduling of color tanks and setup work. The aim is to minimize the makespan for a given set of coils. We present an optimization model for this integrated sequencing and scheduling problem. A core component is a graph theoretical model for concurrent setup scheduling. It is instrumental for building a fast heuristic that is embedded into a genetic algorithm to solve the sequencing problem. The quality of our solutions is evaluated via an integer program based on a combinatorial relaxation, showing that our solutions are within 10% of the optimum. Our algorithm is implemented at Salzgitter Flachstahl GmbH, a major German steel producer. This has led to an average reduction in makespan by over 13% and has greatly exceeded expectations. This paper was accepted by Dimitris Bertsimas, optimization.

线圈涂装集成排序与调度并行颜色罐并发设置调度