何时延迟供应商资格审核是划算的?理论与实验

When Does It Pay to Delay Supplier Qualification? Theory and Experiments

Management Science · 2012
被引 54
人大 A+FT50UTD24ABS 4*

中文导读

研究采购中买方是否应在拍卖前或拍卖后对供应商进行资格审核,发现拍卖后审核时高成本供应商会减少竞价甚至抵制拍卖,实验验证了理论预测。

Abstract

We study a procurement setting in which the buyer seeks a low price but will not allocate the contract to a supplier who has not passed qualification screening. Qualification screening is costly for the buyer, involving product tests, site visits, and interviews. In addition to a qualified incumbent supplier, the buyer has an entrant of unknown qualification. The buyer wishes to run a price-only, open-descending reverse auction between the incumbent and the entrant, and faces a strategic choice about whether to perform qualification screening on the entrant before or after the auction. We analytically study the buyer's optimal strategy, accounting for the fact that under postauction qualification, the incumbent knows he could lose the auction but still win the contract. In our analysis, we derive the incumbent's optimal bidding strategy under postauction qualification and find that he follows a threshold structure in which high-cost incumbents hold back on bidding—or even boycott the auction—to preserve their profit margin, and only lower-cost incumbents bid to win. These results are strikingly different from the usual open-descending auction analysis where all bidders are fully qualified and bidding to win is always a dominant strategy. We test our analytical results in the laboratory, with human subjects. We find that qualitatively our theoretical predictions hold up quite well, although incumbent suppliers bid somewhat more aggressively than the theory predicts, making buyers more inclined to use postauction qualification. This paper was accepted by Martin Lariviere, operations management.

供应商资格筛选时机逆向拍卖投标策略实验经济学