作业车间调度规则选择的实证分析

An empirical analysis of job shop dispatch rule selection

JOURNAL OF OPERATIONS MANAGEMENT · 1981
被引 32
人大 AFT50UTD24ABS 4*

中文导读

研究作业车间调度中调度员如何选择派工规则,通过调查工业工程师和车间主管,发现调度员的选择受进度状态和组织因素影响。

Abstract

Abstract Job shop scheduling usually includes the process of selecting dispatch rules for loading shops with work. Traditionally, dispatch rules have been formed on the basis of processing time, operating time, or queueing order. A job shop scheduling model was developed to include external factors (such as due dates), internal factors (e.g., capacity), as well as influence factors (e.g., job status). Based on the model developed in this report a survey of industrial engineers, shop foremen, and production control supervisors was undertaken to determine what dispatch rules experienced job shop schedulers would select and if the selection process could be influenced by schedule conditions (status) or other organizational factors. Results suggest that schedulers may be influenced by other factors. This article suggests a model for further research with respect to job shop scheduling.

作业车间调度生产调度工业工程运营管理