混合模型排序以最小化效用工作和传送带停机的风险

Mixed-Model Sequencing to Minimize Utility Work and the Risk of Conveyor Stoppage

Management Science · 1995
被引 108
人大 A+FT50UTD24ABS 4*

中文导读

研究在装配线上对N个产品进行排序,以最小化传送带停机的风险和总效用工作。对于单工作站任意处理时间,问题被证明是强NP难的;对于两种产品类型且处理时间恒定的情况,可在O(log N)时间内找到最优序列。

Abstract

This paper investigates the problem of sequencing N products on an assembly line with two objectives: minimizing (1) the risk of conveyor stoppage and (2) the total utility work. For a single station with arbitrary processing times, this problem is proved NP-hard in the strong sense for each of the two objectives. For a single station with two product types, each of which has a constant processing time, a sequence minimizing both objectives can be found in O(log N) computation time.

混合模型排序传送带停线风险辅助工作量NP-hard