Comments on the Two-Product, Single-Machine, Static Demand, Infinite Horizon Lot Scheduling Problem
指出Boctor(1982)关于双产品重复调度可行性的一个必要充分条件证明有误,并给出修正。对研究生产调度和整数规划的学者有参考价值。
One of the necessary and sufficient conditions derived by F. F. Boctor (1982) for feasibility of a repetitive two-product schedule is that the cycle times (T 1 and T 2 ) must be integer multiples of some time interval T (Propositions 2, 3 and 4). This result also holds for N-product schedules. However, the proof for Propositions 3 and 4 in [1] is not exactly valid and therefore a correction has to be made.