工作量依赖的交货期对车间作业绩效的影响

The Effect of Workload Dependent Due-Dates on Job Shop Performance

Management Science · 1983
被引 150
人大 A+FT50UTD24ABS 4*

中文导读

研究基于工作量和机器容量设定交货期的车间控制系统,通过仿真分析参数对延迟均值和标准差的影响,发现系统能有效降低延迟标准差,但对参数取值不敏感。

Abstract

This study explores the due-date performance of job shop control systems which base job due dates on a time-phased representation of the workload and the machine capacity in the shop. The performance is measured by the mean and the standard deviation of the lateness. Two parameters are used to vary the functioning of the due-date assignment system: a minimum allowance for waiting, denoted by SL, and a maximum fraction of the available capacity allowed for loading, denoted by CLL. The system increases the waiting lime allowance if congestion is observed when loading a new job. The capability of the system to observe congestion is determined by the parameters CLL and SL. Simulation experiments are used to investigate the performance of the assignment system. It is shown that the assignment system performs quite well with respect to reducing the standard deviation of the lateness; the performance is not very sensitive however to the parameter values used; with an expected capacity utilization of 90%, CLL should be set between 0.80 and 1.00 times the mean available capacity and SL should be set between 0.55 and 0.90 times the mean operation waiting time in the shop. The assignment system may also perform well with respect to controlling the mean lateness. If SL is set between 0.55 and 0.75 times the mean expected waiting time in the shop, a constant mean lateness is obtained independent of the utilization of the shop if CLL is set between 0.70 and 0.80 times of the mean available capacity. However, the mean lateness turns out to be quite sensitive to variations in the job-mix of the workload. Finally it is shown that if the values of the assignment parameters are adequate, the mean job lateness is independent of the number of operations in a job. This property can be used to monitor the correctness of the parameter values.

作业车间调度交货期设定工作负荷延迟性能