基于仿真优化的最优物料释放时间确定方法

Finding Optimal Material Release Times Using Simulation-Based Optimization

Management Science · 1999
被引 82
人大 A+FT50UTD24ABS 4*

中文导读

提出一种基于蒙特卡洛仿真和随机对等优化技术的方法,为已确定工序顺序的随机生产流水线设定工件释放时间,以最小化延迟并最大化灵活性,适用于含在制品的瞬态场景。

Abstract

We present a method for setting release times for jobs with due dates in a stochastic production flow line for which the sequence of jobs has been determined. Unlike other approaches to this problem, ours considers a transient situation. Thus, the flow line will typically contain work in process (WIP), that is, jobs that have been previously released to the system. Our goal is to develop a job release schedule that not only minimizes tardiness but also maximizes flexibility. The philosophy can be characterized as one that seeks to “release as late as possible, but no later!” Our methodology is based on Monte Carlo simulation and consequent optimization by a method that became known as “stochastic counterpart” or “sample path” simulation-based optimization techniques. We use this method to minimize an expected value objective function that contains terms for tardiness and flow time “costs.” We include a discussion of how the cost parameters of this objective function can be obtained by considering a “characteristic curve” for the system. We also discuss means for obtaining sensitivity analysis with respect to due dates and service times distributions parameters. We conclude with a numerical example.

最优物料释放时间仿真优化随机生产流水线作业调度