存在起始时间限制的人员排班问题

Personnel Tour Scheduling When Starting-Time Restrictions Are Present

Management Science · 1998
被引 65
人大 A+FT50UTD24ABS 4*

中文导读

针对有起始时间限制的排班问题,提出两阶段启发式策略,并在27个美联航机场地勤站测试,最优方法比现有系统更接近理论下限。

Abstract

This paper presents an effective solution strategy for an important category of personnel scheduling problems. Specifically, we address the restricted starting-time tour-scheduling problem (RSTP), which involves the determination of the hours of the day (shifts) and days of the week (days on) that employees are assigned to work. RSTP is characterized by restrictions on the number of daily time periods in which employees may begin their shifts. Moreover, the RSTP we consider contains constraints that require separation of starting times. Such restrictions are widely encountered in practice and are based on a number of factors including managerial concerns for control of employee movements, union contractual obligations, and employee preferences for common shift starting times. A two-stage heuristic solution strategy is proposed for RSTP. We developed eight heuristic procedures based on this strategy and applied them to four sets of labor requirements, for each of 27 United Airlines (UA) airport ground stations. One of the best of these procedures yielded solution costs that averaged only 1.36 full-time-equivalent employees above very conservative LP-based lower bounds. Moreover, the solution costs obtained using this procedure were, on average, 28 percent closer to the lower bounds than solution costs obtained using UA's current scheduling system. We conclude that the two-stage heuristic solution strategy is a valuable platform from which to develop procedures for generating near-optimal solutions to this difficult class of personnel scheduling problems.

人员排班班次开始时间限制两阶段启发式限制性开始时间排班问题