SSD图:一种项目调度与可视化的工具

The SSD graph: a tool for project scheduling and visualization

IEEE Transactions on Engineering Management · 1988
被引 6
ABS 3

中文导读

提出一种名为SSD图(结构、状态与偏差图)的图形工具,用于项目管理的规划调度、控制和评估三个阶段,帮助项目经理查看整体状态和回顾项目绩效。

Abstract

A graphic tool, the SSD (structure, states and deviation) graph, is proposed for three important phases of project management; planning and scheduling, control, and evaluation. The SSD graph represents the structure, states (scheduled and actual states), and deviation of a system. A project management system using the SSD graph is developed, and it visualizes the actual state of a project and keeps the historical record of the project performance. This system allows a project manager to see the overall status and to review the project performance. Several applications have shown its usefulness for scheduling and control of project systems.< <ETX xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">&gt;</ETX>

项目管理调度可视化数据挖掘