一种求解分布式两阶段装配流水车间调度问题的竞争性模因算法

A competitive memetic algorithm for the distributed two-stage assembly flow-shop scheduling problem

International Journal of Production Research · 2015
被引 99 · 同刊同年前 10%
ABS 3

中文导读

研究了分布式两阶段装配流水车间调度问题,以最小化最大完工时间为目标,提出了混合整数线性规划模型和竞争性模因算法,通过实验验证了算法的有效性。

Abstract

This article addresses the distributed two-stage assembly flow-shop scheduling problem (DTSAFSP) with makespan minimisation criterion. A mixed integer linear programming model is presented, and a competitive memetic algorithm (CMA) is proposed. When designing the CMA, a simple encoding scheme is proposed to represent the factory assignment and the job processing sequence; and a ring-based neighbourhood structure is designed for competition and information sharing. Moreover, some knowledge-based local search operators are developed to enhance the exploitation ability. The influence of parameter setting on the CMA is investigated using the analysis of variance method. Extensive computational tests and comparisons are carried out, which demonstrate the effectiveness of the proposed CMA in solving the DTSAFSP.

生产调度模因算法流水车间调度整数规划