基于延迟时间的生产工厂预防性维护建模:某钢厂案例研究

Delay-time-based preventive maintenance modelling for a production plant: a case study in a steel mill

Journal of the Operational Research Society · 2015
被引 30
ABS 3

中文导读

本文以钢厂为案例,提出一种基于延迟时间的预防性维护模型,利用等待原料的生产停歇窗口进行检修,通过区分小缺陷和大缺陷并优化维护间隔,以最小化总停机时间。

Abstract

This paper presents a case study of delay-time-based preventive maintenance (PM) modelling for a production plant system. Since production stoppages caused by waiting for raw materials provide windows to inspect and maintain the system, these production stoppages can be incorporated into the PM model. Considering the nature of different defects that can cause failures, two types of defects are modelled: small and large defects. Small defects are normally dealt with during production stoppages, but both small and large defects can be dealt with over a longer duration during PM. The parameters of the model are estimated using the maximum-likelihood method based on the real data. The model aims to find the optimal PM interval by minimizing the expected total downtime within an overhaul cycle. Management suggestions are also recommended.

预防性维护生产管理可靠性工程钢铁制造