集成装配线平衡决策的供应链网络设计新模型

A new model for supply chain network design with integrated assembly line balancing decisions

International Journal of Production Research · 2015
被引 11
ABS 3

中文导读

提出一个将装配线平衡问题整合进供应链网络设计的新模型和求解方法,通过分解为多个子问题降低计算难度,能更快求解更大规模实例,并分析成本、需求等因素对配置的影响。

Abstract

Supply chain network design aims at the integration of the different actors of a supply chain within a single framework in order to optimise the total profit of the system. In this paper, we consider the integration of line balancing issues within the tactical decisions of the supply chain, and we offer a novel model and a solution approach for the problem. The new approach decomposes the problem into multiple line balancing problems and a mixed integer linear model, which is easier to solve than the previously available non-linear mixed integer formulation. The results show that the new method is able to solve previously studied models within a fraction of the reported running times, and also allows us to solve larger instances than those reported in earlier works. Finally, we also provide some analysis on the influence of the cost structure, the demand and the structure of the assembly process on the final configuration of the assemblies and the distribution network.

供应链管理装配线平衡数学优化工业工程