Scheduling to maximise worker satisfaction and on-time orders
研究了同时最大化按时交付订单和工人满意度的作业调度模型,提出了生成非支配解的求解方法,并开发了原型工具。
Two important managerial objectives incorporated in production planning are the maximisation of the on-time delivery of orders and worker satisfaction. While the maximisation of on-time deliveries has frequently been considered in past production planning research, the component of maximising worker satisfaction has typically been ignored. The assignment of workers to their preferred jobs is an important factor since it results in a productive working environment with high worker performance and a low turnover rate. This study presents a job scheduling model that considers both criteria simultaneously and derives solution approaches to generate non-dominated solutions. The solution approaches are examined under various experimental conditions to evaluate their performance. Finally, a prototype tool developed as a proof of concept is presented.