通过六西格玛的DMAIC方法提升炉嘴制造中的西格玛水平:一个案例研究

Enhancement of sigma level in the manufacturing of furnace nozzle through DMAIC approach of Six Sigma: a case study

Production Planning and Control · 2016
被引 53
ABS 3

中文导读

本文报告了一个炉具制造公司实施六西格玛DMAIC阶段的案例,结果显示在炉嘴钻孔工序中西格玛水平从3.31提升到3.67,表明DMAIC方法能帮助收入较低的公司达到六西格玛质量水平并增强竞争力。

Abstract

In this paper, a case study on implementing Define, Measure, Analyze, Improve and Control (DMAIC) phases of Six Sigma programme in a furnace manufacturing company is reported. When Six Sigma was developed at Motorola, it was encapsulated with DMAIC and belt-based training infrastructure. Since belt-based training is expensive, companies with less revenue have been implementing only DMAIC phases. In this background, the impact of implementing DMAIC phases was examined in the research narrated in this paper through the reporting of the case study mentioned above. As the result of implementing DMAIC phases, the sigma level increased from 3.31 to 3.67 in the case of drilling a hole in a component called ‘furnace nozzle’. This increase in sigma level proved that DMAIC phases are powerful enough to enable the companies with less revenue to perform at six sigma level quality and acquire competitive strength.

质量管理六西格玛制造业运营管理