使用快速毁坏与重建算法最小化相同并行机上的总加权提前与延迟惩罚

Minimising total weighted earliness and tardiness penalties on identical parallel machines using a fast ruin-and-recreate algorithm

International Journal of Production Research · 2016
被引 21
ABS 3

中文导读

研究在相同并行机上,针对严格共同交货期,最小化总加权提前与延迟惩罚的调度问题,提出一种快速毁坏与重建算法,在基准测试中优于现有方法。

Abstract

This paper studies the scheduling problem of minimising total weighted earliness and tardiness penalties on identical parallel machines against a restrictive common due date. This problem is NP-hard in the strong sense and arises in many just-in-time production environments. A fast ruin-and-recreate (FR&R) algorithm is proposed to obtain high-quality solutions to this complex problem. The proposed FR&R algorithm is tested on a well-known set of benchmark test problems that are taken from the literature. Computational results provide evidence of the efficiency of FR&R, which consistently outperform existing algorithms when applied to benchmark instances. This work provides a viable alternative approach for efficiently solving this practical but complex scheduling problem.

生产调度运筹优化准时制生产并行机调度