两阶段装配流水车间中生产与运输的协同调度

Coordinated scheduling of production and transportation in a two-stage assembly flowshop

International Journal of Production Research · 2016
被引 42
ABS 3

中文导读

研究两阶段装配流水车间中生产与运输的协同调度问题,提出两种快速启发式算法和一种混合元启发式算法(HGA-OVNS),以最小化客户平均到达时间与总运输成本的加权和。

Abstract

To enhance the overall performance of supply chains, coordination among production and distribution stages has recently received an increasing interest. This paper considers the coordinated scheduling of production and transportation in a two-stage assembly flowshop environment. In this problem, product components are first produced and assembled in a two-stage assembly flowshop, and then completed final products are delivered to a customer in batches. Considering the NP-hard nature of this scheduling problem, two fast heuristics (SPT-based heuristic and LPT-based heuristic) and a new hybrid meta-heuristic (HGA-OVNS) are presented to minimise the weighted sum of average arrival time at the customer and total delivery cost. To guide the search process to more promising areas, the proposed HGA-OVNS integrates genetic algorithm with variable neighbourhood search (VNS) to generate the offspring individuals. Furthermore, to enhance the effectiveness of VNS, the opposition-based learning (OBL) is applied to establish some novel opposite neighbourhood structures. The proposed algorithms are validated on a set of randomly generated instances, and the computation results indicate the superiority of HGA-OVNS in quality of solutions.

供应链协调生产调度运输调度启发式算法元启发式算法