一种将硫化决策规划视为具有有限零件相关工装的特定一维下料问题,适用于按订单生产的工业环境

A vulcanising decision planning as a particular one-dimensional cutting stock problem with limited part-related tooling in make-to-order industrial environments

International Journal of Production Research · 2016
被引 11
ABS 3

中文导读

本文针对汽车橡胶弯管硫化操作,提出一种带六项附加特征的一维下料问题模型,用整数规划和启发式算法最小化制造周期数,对按订单生产环境下的资源规划有参考价值。

Abstract

A specialised case of the classical one-dimensional cutting stock problem (1D-CSP) with six main additional features is adapted in this paper to model and solve planning unit operations with limited resources in the make-to-order industrial environment, generating a new decision-making problem. The objective is to satisfy demand using the minimum number of manufacturing cycles. Although there is a large number of applications, this paper proposes a decision model directed at the vulcanising operation during the manufacturing of rubber curved hoses in the automotive industry. Because each vulcanising cycle (VC) uses a considerable amount of resources, the need to minimise the total number of VCs is of importance due to its direct relationship with lead time and productivity. An integer-programming model based on a network optimisation formulation is proposed to solve the problem to optimality and allows for construction of the mathematical model. In addition, due to the limited capacity of computers to solve large instances, a heuristic is developed to obtain near-optimal solutions. Scheduling issues are found in the optimal solution of the integer-programming model, but the heuristic overcomes such obstacles. Numerical experiments demonstrate the efficiency of the heuristic.

运筹学整数规划生产调度汽车工业下料问题