单机双代理CON/SLK交货期指派与调度问题

CON/SLK due date assignment and scheduling on a single machine with two agents

Naval Research Logistics · 2016
被引 53 · 同刊同年前 7%
ABS 3

中文导读

研究单机环境下两个代理的调度问题,A代理的交货期由CON或SLK方法决定,目标是最小化A代理的集成成本,同时保证B代理的目标不超过给定限值,并设计了多项式或伪多项式动态规划算法。

Abstract

Abstract We consider scheduling problems involving two agents (agents A and B ), each having a set of jobs that compete for the use of a common machine to process their respective jobs. The due dates of the A ‐jobs are decision variables, which are determined by using the common ( CON ) or slack ( SLK ) due date assignment methods. Each agent wants to minimize a certain performance criterion depending on the completion times of its jobs only. Under each due date assignment method, the criterion of agent A is always the same, namely an integrated criterion consisting of the due date assignment cost and the weighted number of tardy jobs. Several different criteria are considered for agent B , including the maxima of regular functions (associated with each job), the total (weighted) completion time, and the weighted number of tardy jobs. The overall objective is to minimize the performance criterion of agent A , while keeping the objective value of agent B no greater than a given limit. We analyze the computational complexity, and devise polynomial or pseudo‐polynomial dynamic programming algorithms for the considered problems. We also convert, if viable, any of the devised pseudopolynomial dynamic programming algorithms into a fully polynomial‐time approximation scheme. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 416–429, 2016

生产调度交货期指派双代理调度动态规划