预制建筑供应链管理中生产提前期对冲与协调

Production lead-time hedging and coordination in prefabricated construction supply chain management

International Journal of Production Research · 2016
被引 103 · 同刊同年前 9%
ABS 3

中文导读

研究预制建筑供应链中因生产不确定性导致的提前期对冲问题,提出包含赶工费用和固定转移支付的协调方案,通过三种权力结构模型优化提前期对冲量,实现双方共赢。

Abstract

This paper studies a coordination scheme to solve a production lead-time hedging (PLTH) issue in the prefabricated construction supply chain management. To mitigate tardiness delivery owing to prefab production uncertainty, the project contractor (PC) prefers to inform the prefab factory (PF) an earlier due date which is termed as PLTH strategy. However, this strategy forces the PF to compress its production process. A balance must be optimised through the proposed PLTH coordination scheme. It includes a PLTH-related cost term, i.e. crashing money (charged by the PF to the PC) and a constant transfer term. Three models with different power structures are considered. Firstly, two Stackelberg games with alternative decision-making sequences and an equal power model are discussed to obtain the optimal PLTH amount and crashing money. Later on, a cost-sharing term is used to fairly allocate the system surplus. It is observed that this coordination scheme reduces the PLTH amount and ensures win–win coordination for both parties. Some interesting managerial implications are also obtained from comparison analysis and numerical studies.

供应链管理预制建筑生产调度协调机制风险管理