面向多工厂炼钢-连铸-热轧集成订单计划的多目标和谐搜索

Many-objective harmony search for integrated order planning in steelmaking-continuous casting-hot rolling production of multi-plants

International Journal of Production Research · 2016
被引 17
ABS 3

中文导读

研究了多工厂炼钢-连铸-热轧生产中考虑四个冲突目标的集成订单计划问题,提出一种新的膝点驱动多目标和谐搜索算法,实验证明其优于其他流行方法。

Abstract

This paper investigates a challenging problem of integrated order planning (IOP) in steelmaking-continuous casting-hot rolling production of multiple plants with consideration of four conflicting objectives. The objective functions refer to the earliness/tardiness ratio, the non-hot charge ratio and the imbalance ratio of production capacity utilisation corresponding to SCC plants and HR Plants. The IOP guided by the integration strategy, which includes the vertical integration of production stages and the horizontal integration of steel plants, is regarded as a large-scale many-objective optimisation problem. To deal with the difficulty of large-scale decision variables, we introduce a new concept named ‘order-set’ for modelling. In addition, a novel knee point-driven many-objective global-best harmony search (KGHS) algorithm, mainly integrating a KGHS process and a new knee point-driven Pareto optimisation, is developed to tackle this many-objective problem. The proposed model and algorithm were tested with benchmarks and real production data. Experiments demonstrate that the proposed approach generates effective solutions superior to those generated by the other popular many-objective optimisation methods.

钢铁生产订单计划多目标优化生产调度工业工程