带维护与生产的机器最优调度问题的计算方法

Computational method for optimal machine scheduling problem with maintenance and production

International Journal of Production Research · 2016
被引 30
ABS 3

中文导读

将机器维护与生产调度问题建模为随机切换脉冲最优控制问题,通过变换和算法求解,并用数值例子验证有效性。

Abstract

This paper considers an optimal scheduling problem of maintenance and production for a machine. Firstly, the problem is formulated as a stochastic switched impulsive optimal control problem. However, there exists the stochastic disturbance in this model. Thus, it is difficult to solve the problem by conventional optimisation techniques. To overcome this difficulty, the stochastic switched impulsive optimal control problem is transformed into a deterministic switched impulsive optimal control problem with continuous state inequality constraints. Then, by combining a time-scaling transformation, a second-order smoothing technique and a penalty function method, an improved Newton algorithm is developed for solving this problem. Convergence results indicate that the algorithm is globally convergent with quadratic rate. Finally, two numerical examples are provided to illustrate the effectiveness of the developed algorithm.

最优控制生产调度数学优化机器维护