一种面向加工时间依赖产品质量的节能调度的三阶段分解方法

A three-stage decomposition approach for energy-aware scheduling with processing-time-dependent product quality

International Journal of Production Research · 2016
被引 29
ABS 3

中文导读

针对产品加工时间影响质量、能耗与速度及设备状态相关的流水车间调度问题,提出三阶段分解方法,将最优性差距控制在4%以内,并揭示增加可选速度或放宽交货期可提升能效的管理启示。

Abstract

Due to increasing concerns about energy and environmental demands, decision-makers in industrial companies have developed awareness about energy use and energy efficiency when engaging in short-term production scheduling and planning. This paper studied a flow-shop scheduling problem consisting of a series of processing stages and one final quality check stage with the aim of minimising energy consumption. In particular, the product quality in the problem depends on its processing time at each stage, and the energy consumption is related to the processing speed, equipment state and product quality. A novel three-stage decomposition approach is presented to solve the proposed energy-aware scheduling (EAS) problem. The decomposition approach can drastically reduce the search space and provide reliable solutions for the EAS problem. The numerical experiments show that the computational results can achieve an optimality gap of less than 4% when compared to the global optimal solutions. The parameter analysis demonstrates the managerial implications of the proposed problem. For example, increasing the number of alternative processing speeds or relaxing the delivery date will increase energy efficiency. The energy-saving potential is illustrated by comparing the scheduling results using the proposed approach and human experience.

生产调度节能优化流水车间调度工业工程