利用高保真压水堆模拟器进行预测性建模

Prognostic Modeling Utilizing a High-Fidelity Pressurized Water Reactor Simulator

IEEE Transactions on Systems, Man, and Cybernetics: Systems · 2017
被引 5
ABS 3

中文导读

针对发电行业缺乏运行至故障数据的问题,提出利用全范围高保真模拟器生成故障数据,并基于相似性方法预测阀门资产的剩余使用寿命,案例基于970 MW压水堆模拟。

Abstract

Within power generation, aging assets and an emphasis on more efficient operation of power systems and improved maintenance decision methods has led to a growing focus on asset prognostics. The main challenge facing the implementation of successful asset prognostics in power generation is the lack of available run-to-failure data. This paper proposes to overcome this issue by use of full-scope high-fidelity simulators to generate the run-to-failure data required. From this simulated failure data a similarity-based prognostic approach is developed for estimating the remaining useful life of a valve asset. Case study data is generated by initializing prebuilt industrial failure models within a 970 MW pressurized water reactor simulation. Such full-scope high-fidelity simulators are mainly operated for training purposes, allowing personnel to gain experience of standard operation as well as failures within a safe, simulated operating environment. This paper repurposes such a high-fidelity simulator to generate the type of data and affects that would be produced in the event of a fault. The fault scenario is then run multiple times to generate a library of failure events. This library of events was then split into training and test batches for building the prognostic model. Results are presented and conclusions drawn about the success of the technique and the use of high-fidelity simulators in this manner.

电力系统资产预测可靠性工程核能工程