Application of value stream mapping (VSM) for lean and cycle time reduction in complex production environments: a case study
通过案例研究,展示了在复杂生产环境中(如按订单设计和多品种小批量)如何简化应用价值流图来实现精益改进,减少浪费和缩短周期时间。
The application of VSM is a proven approach for lean-based improvements. Typically, this becomes challenging, when applied for complex production environments. The purpose of this research is to demonstrate, how with some approximations and simplifications in VSM application, lean can be successfully achieved in these environments. The research follows case study method and systematically guides about the segregation and treatment of non-value-adding(NVA) and value-adding (VA) activities of heavy-duty industrial power transformer making process. The focal company operates in engineer to order (ETO) and high-mix low-volume (HMLV) environments. With a research team using gemba walks and systematic questioning technique, relevant data were collected for mapping. Taguchi method was also applied for one of the critical steps, which was influencing cycle time and energy requirements. The generalisable findings endorse the strengths of approach for lean by addressing wastes and cycle time reduction. The study establishes that VSM application-based lean messages remain same for both simple and complex environments. It also exposes that non-compliance of ‘VSM assumptions’ and ‘micro-concepts’ are the root causes for application complexities. The study also offers useful insights and practical guidelines to facilitate lean in ETO, construction and HMLV production environments.